OEE intelligence

Module 02 / 04

One honest number, and the three behind it.

Availability, performance and quality per machine, line and shift, with the minutes lost behind every percentage point.

Try the what-if

Plant OEE · Shift A

Benchmark 85%
OEE0.0%Target 85%
Availability
91.6%
Performance
82.7%
Quality
98.8%

OEE intelligence

Know whether your target is being lost to availability, performance or quality.

OEE is one number. Concept Digital Factory shows the three numbers behind it and the minutes behind each of those, per machine, per shift, as it happens.

  1. Planned production time100.0%

    432 min elapsed

  2. After availability loss8.4 pts91.6%

    Stops, waits, changeovers · 36 min / machine

  3. After performance loss15.8 pts75.8%

    Slow cycles and micro-stops

  4. After quality loss0.9 pts74.8%

    Scrap and rework

Plant OEE · Shift ABenchmark 85%
OEE0.0%Target 85%
  • 0.0%

    Availability

  • 0.0%

    Performance

  • 0.0%

    Quality

Decision support

Move a loss. See the parts.

Every point of OEE is a number of parts per shift. Drag availability, performance or quality and see what recovering that loss would be worth.

What-if

  • 91.6%0.0
    60%+0 min run time / shift100%
  • 82.7%0.0
    60%ideal cycle ÷ actual cycle100%
  • 98.8%0.0
    90%first-pass yield100%

Result

Baseline 74.8%
OEE0.0%Target 85%
OEE change
0.0 pts
Parts / shift
0
Per year · 3 shifts × 250 days
0 parts

Based on today's target of 10,000 parts at 74.8% OEE

Detail

Per machine, per shift, per day.

Sort the table by the loss you want to chase. The trend and the shift comparison update from the same data.

OEE by machine

Shift A · sortable
CNC-0598.1%94.5%99.3%92.1%2,310 / 2,400
CNC-0195.8%93.0%99.1%88.3%1,248 / 1,400
CNC-0297.9%89.5%99.6%87.3%812 / 900
CNC-0387.3%92.7%98.9%80.0%1,105 / 1,300
CNC-0477.8%87.3%97.4%66.2%640 / 1,000
CNC-0664.8%94.4%99.0%60.6%305 / 600

7-day trend

Plant
60708090TARGET 85MONTUEWEDTHUFRISATTODAY

By shift

OEE · 24 h
  • Shift ANOW74.8%

    06:00 – 14:00 · 8,420 parts

  • Shift B71.2%

    14:00 – 22:00 · 9,160 parts

  • Shift C68.5%

    22:00 – 06:00 · 8,730 parts

In practice

Questions this module answers on the floor.

  • Where is the shift losing its target?

  • Is it stops, slow cycles or scrap?

  • Which shift runs the plant best?

Get started

Your machines are already generating the data.

Start turning every production signal into a better decision.